AP-5c Wale or Tie Rod Connection Failure
NOTE
Event tree was adapted from potential failure mode progression in EM 1110-2-2502 Floodwalls and Other Hydraulic Retaining Walls.

NOTE
Branches after Node 4 should reference PFM CP-2 to result in breach.
Event tree was adapted from potential failure mode progression in EM 1110-2-2502 Floodwalls and Other Hydraulic Retaining Walls.

Branches after Node 4 should reference PFM CP-2 to result in breach.