AP-1b Axial Capacity Failure Due to Inadequate Pile Penetration
NOTE
Event tree was adapted from potential failure mode progression in EM 1110-2-2502 Floodwalls and Other Hydraulic Retaining Walls.

NOTE
Branches after Node 4 should reference PFM AP-1a or PFM AP-5a to result in breach.