SF-5 Internal Erosion
NOTE
Event tree was adapted from potential failure mode progression in EM 1110-2-2502 Floodwalls and Other Hydraulic Retaining Walls.

Event tree was adapted from potential failure mode progression in EM 1110-2-2502 Floodwalls and Other Hydraulic Retaining Walls.
