Concrete Lined Spillway Erosion (Slab Jacking)

NOTE
-
Node 1 can be expanded into several branches to account for differing gap widths and offset heights.
-
Nodes 5 through 7 can be expanded to account for differing amounts of passive wedge removal (Node 5), evaluation of the PFM even if scour does not progress beneath the monolith(s) (Node 6), or differing scour widths (Node 7).